Here's how you can send us
your donation
|
By Credit Card
|
Through PayPal:
|
|
By Check (3
options)
|
1. Payable to:
IMAN, P.O. Box
6544, Bellevue, WA 98008-0544, USA
|
|
2. Payable
to: NASIMCO P. O. Box
87629, Thornhill, Ontario, L3T 7R3,
Canada
OR
P. O. Box 29691, Brooklyn Centre, MN
55429, USA
|
3. Payable to: The World
Federation of Khoja Shia
Ithna-asheri Muslim Communities,
Islamic Centre, Woodland Stanmore,
Middlesex, HA7 4LQ, UK
(Only use this option if you are
outside North America)
|
|
By Direct Deposit
|
Bank Name:
Bank of America
Bank Address: 7450 170th Ave NE, Redmond WA
98052, USA
Bank ABA Number: 0260-0959-3
SWIFT: BOFAUS3N
Routing Number: 125000024
For the Credit of: Ithna-asheri Muslim Association
of Northwest
Account Number: 21860416
|
|
Other ways you can help
You can help by raising awareness of our
project with your friends, families and acquaintances. We
have created a downloadable document
for your convenience that you can use to spread the message.
Project Status
As of 9/1/2008, all of upper level is
approximately 96% complete, pending some touch-up work and
approval of punch list by IMAN and DLR. Representatives from the
facilities committee have been through training for the AV
system and HVAC system. The main outstanding item to be
completed for upper level is the prayer hall carpet, which is
due to arrive this week. The ornamental columns in the prayer
hall are nearly complete, pending touch up work and paint. The
lower level (mostly school classrooms and library) is within one
week of completion. On Thursday morning we discovered an issue
with clogged existing plumbing in the kitchenette that was
investigated and the root cause was determined. SD Deacon is
working hard to fix the issue this week. We have received Final
Certificate of Occupancy from City of Kirkland for upper and
lower levels. It is planned for the upper level to be turned
over to IMAN by late Friday 9/5/08.
During early stages of the construction we discovered that the
building foundation had settled along the east side. We had to
bring specialists to assess the situation and come up with a
solution. The foundation was successfully lifted and proper
drainage was added at the footing.
Due to the foundation settling and other unanticipated changes
including replacement of doors and windows, installation of
subfloor sheeting, and hazardous substance removal, our
remodeling cost has increased by $200,000, hence the new target
as indicated in the thermometer above.
|